Quick answer

How Long Does Foundation Repair Take?

Some repairs are small and some touch most of the house, so the honest answer depends on yours. Here is what decides the schedule, and when you will know it.

Short answer

It depends on the job. The number of piers, whether any go through the floor inside, engineer review and permits, the weather, and any plumbing that needs fixing first all change the timeline. You won’t be guessing: Matt and Rosie give you the schedule before any work starts.

What Decides How Long It Takes

  • How many piers. Each pier is dug, pressed down to bedrock at 10,000 psi, and capped. More piers means more of that work.
  • How deep bedrock is. Where rock is close to the surface, piers stop sooner. Where clay runs deep, each pier takes more sections.
  • Inside or outside. Piers along the outside walls are dug from the yard. Interior piers mean breaking out the floor, working inside the house, and patching the openings after.
  • The type of house. A slab, a pier and beam house, and a manufactured home each go together differently.
  • Access. Tight side yards, patios, and decks over the work area take longer to work around.

What Happens Before the Crew Arrives

Some of the time is on paper, before anyone digs. Every repair we do is certified by a licensed structural engineer, and we pull permits when the city requires them. In San Antonio, foundation repair needs a permit. How long the engineer review and permit take depends on the engineer’s and the city’s schedules, not ours, so we plan around them. Our page on foundation repair permits explains more.

Plumbing comes first

If a leak under the slab is soaking the soil, it should be found and fixed before the house is lifted. Otherwise the soil keeps moving under the new work. That repair is done by a plumber, and their timing becomes part of yours. Our guide to under-slab plumbing leaks explains why we ask about it.

Weather and San Antonio Soil

Heavy rain can turn open pier holes into mud and push the work back a day or more. Very wet clay is also harder to dig and fill cleanly. Long dry spells are usually easier to work in. San Antonio weather swings from hot, dry summers to heavy rain, so we keep an eye on the forecast and tell you if it changes the plan.

What Repair Day Looks Like

Hydraulic jack set on a pier inside a hole cut through the slab, ready to lift
A hydraulic jack set on a pier inside a slab opening, ready to lift.
  1. Pier holes are dug where the plan shows, outside and, if needed, through the floor inside.
  2. Each pier is pressed down until it stops on bedrock at 10,000 psi.
  3. The house is lifted back toward level on the new piers and shimmed.
  4. Holes are filled and any slab openings are patched before we leave.

Both owners, Matt and Rosie, are on every job, so you have the same people from the first visit to the cleanup. Our process page walks through each step.

When You Get the Schedule

After the free inspection, you get a plan and an exact written price. Once you decide to go ahead, Rosie tells you when the crew is coming and what to expect each day, before any work starts. If the weather or a permit moves things, she lets you know.

How You Can Help Keep It on Track

Most of what sets the timeline is out of your hands, but a few things on your side make repair day go smoother:

  • Clear the areas along the outside walls where the piers will go.
  • If piers go through a floor inside, move furniture and rugs out of those rooms ahead of time.
  • Point out sprinkler lines, buried cables, or anything else close to the foundation.
  • Tell us about any plumbing leaks you know of, so they can be handled first.
  • Keep pets inside or away from the work area.

If the crew finds something nobody could see at the inspection, like an old leak or a buried line right where a pier needs to go, we stop and talk it through with you before going on.

Related questions

Do I need to leave the house during the repair?

Usually not. Someone should be home at the start so we can go over the plan, and any time we need to work inside.

Can you start before the permit is issued?

When the city requires a permit, we follow its process. We pull the permit as part of the job.

Does pier type change the timeline?

Repair day looks much the same for steel and concrete piers. The number of piers and where they go matter more.

When are cracks filled?

After the house is level and stable. Filling a crack on a foundation that is still moving doesn’t last.

Written by Matthew Zeman, co-owner of We Level Homes, with almost 20 years in foundation repair. Last updated November 18, 2026.

Ready for a Straight Answer About Your Foundation?

Call or text Matt and Rosie, book a free foundation inspection, or ask for a free in-home estimate. We serve San Antonio and the surrounding areas.

Free in-home estimates Monday through Saturday, as early as 8 AM and as late as 7 PM.